Author: aussiecomadmin

Carfax wins 2019 MBA Excellence in Construction Award

Category: Interior Fitout Project:  Bangarra Dance Studio, Barangaroo Carfax were proud winners of a NSW Master Builder's Excellence in Construction Award at the 2019 Awards Night on Saturday 9th November 2019. The project required the conversion of the future diesel generator plant room in the Basement 2 of the Barangaroo complex into a multi-storey dance theatre for the Bangarra Dance Theatre. The visual highlight is the "pleated" ceiling, The level of details and setout required to achieve the desired result is commendable. To achieve the desired result, a great deal of planning and co-ordination was essential. The way the team solved the problems of access, acoustics, structural, existing services and modification and restricted headroom on the mezzanine level is a testament to their initiative and energy. Overall, the works were well executed to a high standard under difficult conditions. A high level of skill and co-ordination has been demonstrated to achieve the final result. To read more about this project, click here Client: The NSW Department of Planning & Environment Architect: Tonkin Zulaikha Greer Architects...

Carfax wins 2016 NSW MBA Excellence in Construction Award

Category: Refurbishment/Renovation/Extension Project: Woodstock House, Plumpton Carfax were proud winners at the MBA Awards night held on 5th November 2016. Refurbishment & restoration works were undertaken at Woodstock House, Plumpton to renew & restore an existing historic building including an extension to Pavilion 3. Woodstock House was in a direlict state at the time the contract was awarded to Carfax. Not only was the project challenging and complex in nature due to the Heritage significance and the state of disrepair, the building had severe damage to the entire structure, due to both active termites, and massive drainage issues which caused structural failures to the building. The works included lifting & levelling of structure, strengthening foundations, removal and replacement of termite-damaged timber, roofing restoration, including chimney pots, fireplace restoration, structural repairs to brickwork, underpinning, new flooring, new verandahs and courtyard pergola, installation of internal wall linings, re-installation of external cladding, installation of new timber windows, external and internal painting and extemsive associated landscaping and fencing. Additional works added to the contract at a later stage were the construction of concrete ramps, and handrail installation for disabled access. The project was completed two months ahead of programme. To read more about this project, please click here Client: Blacktown City Council Architect: Tropman & Tropman...

Carfax is a proud winner of TWO 2014 MBA Excellence in Construction Awards

Category: Tertiary Buildings $5-$10M Project: JFF Studios, National Institute of Dramatic Art, Kensington The JFF Studios incorporated the construction of a three storied entertainment and performance space, including high-end architectural and acoustic fitout, complete with complex lighting arrangements, new passenger lift & outdoor terrace. The JFF Studios have been built within the existing facility at NIDA, overlooking the main entry foyer to the south and the courtyard to the north. NIDA remained fully operational throughout the construction of this project. To read more about this project, please click here. AND Category: Restoration of an Historic Building $10M+ Project: Graythwaite Estate Stage 1 Works, Shore School, North Sydney Graythwaite Estate is a place of exceptional heritage significance.  The History of Graythwaite House dates back to the early 1830’s with sections of the remaining fabric arguably the oldest remaining structures of its type in the North Sydney area. In 1915, Graythwaite was donated by the then owner Sir Thomas Gibbs, to the Government as a convalescent home for return soldiers and therefore has a direct link to the ANZAC’s. The buildings within Graythwaite Estate were in a state of utter disrepair when Carfax won the bid for restoration works for the new owners of Graythwaite, The Sydney Church of England Grammar School (Shore School). The Scope of works was to conserve, restore and adapt the 3 buildings to be used for school purposes, as follows; Graythwaite House c 1833 The Coach House c 1882 The Tom O’Neil Centre c 1915 The scope also included landscaping, civil and external works such as palisade fencing, sandstone walls, pavements and formal gardens. To read more about this project, please click here. ...

Carfax wins 2013 NSW MBA Excellence in Construction Award

Category: Tertiary Buildings $3-5M Project: NFF Galleries & Atrium Theatre, National Institute of Dramatic Art, Kensington Carfax were proud winners at the MBA Awards night held on 2nd November 2013. Nancy Fairfax Foyer Galleries (NFF Galleries) – A new cantilevered glazed façade performance space / tutorial rooms, consisting of 4 separate rooms on two levels overlooking the existing foyer and The Atrium Theatre - A partially glass roofed atrium, connecting 2 buildings to be used as an outdoor performance space, while complying with all of the necessary BCA requirements for a entertainment venue, including complete fire services. As NIDA’s demand for space from both current enrolments, and their students participating in their Open Programme increases, so too must their learning spaces. As extending buildings on their current site is not an option, due to limited space, innovative solutions are required to transform unused space within the existing building to classrooms, rehearsal rooms, theatres and meeting rooms. Thus, the concept of the NFF Galleries and The Atrium Theatre were brought to life in 2012. To read more about this project, please click here....

Carfax wins 2012 NSW MBA Excellence in Construction Award

Category: Best Use of Timber Project: Western Circulation Link, Taronga Zoo Carfax were proud winners at the MBA Awards night held on 3rd November 2012. The Western Circulation Link project is a unique 300m long timber walkway that provides the link for visitors to stroll from the Chimpanzee Sanctuary down to the African Walkthrough exhibit. Previously inaccessible to the public, visitors can now walk comfortably between the Chimpanzee Sanctuary and the Snow Leopard exhibit on a combination of raised timber boardwalks and salt-etched concrete paths.  The walkway allows clear views of the Barbary Sheep and the Himalayan Mountain Tahrs on their rock mountain. Up to 3m high in some places, Zoo patrons pass through tree-tops as they descend through a series of transitional zones offering a choice of either direct stair access or accessible ramps. This project also incorporated the refurbishment of a dilapidated heritage-listed hut through which the walkway now passes and the "re-thatching" of the existing African hut at the entrance to the new Western Link.  Visitors can enjoy framed views of the Sydney Harbour Bridge and Opera House from both these vantage points. This project was completed in some of the steepest and most difficult terrain at Taronga Zoo.  Carfax encountered many challenges during construction, including working adjacent to occupied exhibits and public areas, restricted access to the site and complex materials handling logistics. The end result is a stunning accessible walkway that incorporates striking Australian Hardwoods, decorative "salt washed" concrete paths, stairs and ramps, restored Heritage Pavilions all completed to the highest quality workmanship. This project provides an impressive structure to an iconic Sydney Attraction. To read more about this project, please click here....

Carfax wins NSW MBA Excellence in Construction Award in 2009

Category: Sporting Facilities up to $5 million – Construction Technique / Equipment Project: Jindabyne Recreation Hall Stage 1, Jindabyne Academy of Sport & Recreation They recently completed a new auditorium at the NSW Sport and Recreation site at Jindabyne and this project won the category of Sporting Facilities up to $5 million – Construction Technique/Equipment. The aim was to provide a mixed use structure to accommodate the needs of staff & visitors and a student learning facility as a central hub for the organisation. This facility is being used for the delivery and co-ordination of the centre’s overall learning experience for students. An existing dilapidated building was demolished to make way for the new 655m2 building, with associated road works and landscaping. The building represents stage one of a three stage master planned project, that will be a significant upgrade of the student precinct.  To meet the client's requirements of a compressed timeline, an innovative construction methodology was conceived. It was decided that the wet and storage spaces be prefabricated off site and the primary steel framed building was designed as an independent braced structure to allow for the prefabricated elements to be craned into place. Each 35m2 prefabricated module was constructed in vertical halves, with the upper section of each complete with roof structure, and pre-fitted with mechanical, electrical and hydraulic services – serving as plant for the entire complex. The lower section was pre-finished for occupancy. The cladding was designed to allow the steel framed elements to be seamlessly fastened together on site. Subfloor vented voids were designed to allow for stormwater and sewer outfall, and the connection of an extensive hydronic slab heating system. High levels of insulation were provided through all external elements, polystyrene lightweight cladding, combined with shadow clad plywood and matrix panels, together with double glazed low E window suites, ensure that the building will have high thermal performance in the sub-alpine conditions. The client is delighted with the outcome and envisages additional commercial opportunities for the centre during those times when the facilities are not in use by the centre’s core market groups. To read more about this project, please click here....

Carfax wins Two NSW MBA Excellence in Construction Awards in 2008

Category: Best Use of External Timber Project:  Wentworth Common Adventure Playground The concept behind the Wentworth Common Adventure Playground project was to provide a nature-based play experience for children of all ages. With this is mind, the design offers a variety of activities such as dip netting and bird watching, water play activities in ponds and on swales between ponds. The project included a series of off-the-shelf play elements and purpose made elements to encourage interaction with the natural aspects of the design. The ‘nest’ is a purpose made item that was constructed to encourage a range of balancing and stepping activities as part of the overall playground experience. A series of custom made timber ‘boxes’ made from, 100% certified recycled Australian hardwoods have been provided to allow rest and observation during play. At the south end of the project, a timber bird hide has been constructed overlooking the Eastern Water Quality Control Pond. The hide provides partial concealment and seating for viewers of the pond. The design also created two additional ponds one being an ephemeral pond and one being a shallow pond serviced by water from the Sydney Olympic Parks WRAMS plant (Water Reclamation and Management System). All timber elements used for the project are 100% Recycled Australian Hardwood hand picked and re-claimed from various sites all around Australia. The realization of the intricate conceptual design of these boxes required the input from an Engineering firm engaged by Carfax. They aided in taking the design from concept to reality without compromising the Architectural intent. Category: Environmental Management Project: Wentworth Common Adventure Playground One of the largest problematic considerations for the project was that the site is located within the natural habitat of the Green and Golden Bell Frog which is a protected species. The frog is classified as endangered in NSW under the Threatened Species Conservation Act 1995 and as a vulnerable species under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999. To reduce the impact of the construction on the frogs, a perimeter was established with an approved ‘frog fence’ and a team of environmentalists were utilized to clear the entire area of frogs over a period of many weeks prior to commencement. Ongoing maintenance and control of the height of the vegetation was required to ensure that the Green and Golden Bell frogs did not inhabit the perimeter or the work area. Environmental audits by Sydney Olympic Park Authority’s team were conducted over the duration of the project. Given the proximity of the new Wentworth Common ponds to other ponds managed for Bell Frog conservation, a critical environmental management requirement was that these ponds were designed to ensure that they can remain Gambusia-free. This involved designing them to be periodically drained and dried out as necessary. The Gambusia, or mosquito fish, is a large threat to the protected Green and Golden Bell Frog. This was a constant site management concern given that the Gambusia can be transferred on the workers boots from the Eastern Water Quality Control Pond to other ponds within the frogs’ habitat, should the sequence of works not be adhered to. Further difficulties were experienced with the use of geotechnical drilling rigs and pier boring within and adjacent the wetland areas and within metres of Sydney Olympic Parks Eastern Water Quality Control Pond. Given the close proximity to existing water courses and wetlands, a comprehensive siltation control plan was adopted in accordance with our Environmental Management System, ISO14001:2004. All excavated material was wrapped with geo-textile fabric whilst awaiting transfer to another site within the facility. To read more about this project, please click here....

Breaking News! 

Carfax wins the 2026 MBA Excellence in Construction Award

Public Buildings – up to $3M 

read more…